GUIMS
Active moduleHome
Guest
Offline
GUIMS
OPERATIONAL HOME

Current shift, -

All operating zones

Checking networkCentral server
Scope & Filters
Waiting for central synchronization.
Open actions0Central data pending
Pending approvals—Central data pending
Underground conditionsReview required
Last syncWaiting0 items waiting

Priority workplaces

Ranked by severity, then by open actions

No active priority.

Workplace barricades

Latest barricade and signage control recorded in New Audit

0 audited workplaces
In place0
Partial0
Not in place0

No New Audit barricade control recorded for this scope.

Today’s route

Suggested operational sequence

  1. No route available for this scope.

Recent work

Latest saved inspections

No inspections yet.

Showing latest audits

Active Mine Alerts

Operational reports requiring follow-up

Loading Mine Alerts…

Awaiting my approval

—

No pending approval.

STANDARDNCNNCR-1NCR-2

Access is displayed according to department and level.

Read-only access
Module New Audit

New Audit

Structured field inspection to identify the workplace, select the support model, assess risks and generate actions.

Audit status Not calculated Ref : -
Gallery / location-
Activity type-
Inspection model-
CompliancePending?
1. Identification 2. Safety 3. Support parameters 4. Assess and save

Workplace

Safety

Excavation Spans

AreaHeight mWidth mStatusComment

Spread View Sketch (Not to scale)

Not-to-scale field sketch with freehand and assisted geotechnical tools.

Support Parameters

#ParameterStdActualRiskAuto ActionCommentPhoto

Complete the required field controls before signing.

Calculate the audit to generate observations.

Validation, signatures and automatic distribution

The record must follow the three steps below. An approved step cannot be bypassed.

1Geotech auditorSignature assignment
2Geotech supervisorValidation assignment
3Mine OperationApproval assignment
Step 1Geotech auditor

Use the secure signature pad below.

Waiting for the Geotech signature.

Step 2Geotech supervisor

Use the secure signature pad below.

Locked until the Geotech inspector signs.

Step 3Mine Operation

Use the secure signature pad below.

Locked until Geotech approval.

Secure handwritten signatureMouse, finger or stylus
Server identity loaded at sign-in
Approval history and timelineSignatures retained by document version
Version 1

No electronic signature.

Step 1: waiting for the Geotech inspector.
Distribution and notificationsInternal inbox always active; email uses SMTP when configured

Distribution starts after full approval.

Operator assessment

Enter the compliance percentage and select the support class based on your field assessment. Both values are recorded as entered.

Operator assessmentPending—
Support classPending
Technical riskPending
Required actionPending

Mine Alert

Loading operational reporting workspace…

Geotechnical Monitoring

Loading instrument monitoring workspace…

Read-only access

Corrective Actions

Engineers may progress an action to In Progress. Closing or reopening an action requires approval permission and is recorded in the audit log.

InspectionParameterActionPriorityStatusControl

Account Profile and session history

Loading Gallery Evolution…
Read-only access

Inspection archive

Filters

Archived inspections

RefWorkplaceActivityDateRiskCompliancePDF form
Page 1
Read-only access
Controlled workflow

Approvals

Review inspections assigned to you and open the controlled signature workflow.

Average score0%
Inspections0
Open actions0
High / Critical0

Inspection approval queue

No approval data available.

InspectionWorkplaceRiskStageAssigned toDueStatusAction
No approvals in this queue.

Pull Test approval queue

No Pull Test approval data available.

TestLocationResultReasonSubmittedStatusActions
No Pull Tests in this queue.

Geotechnical Instruction approval queue

No GI approval data available.

InstructionSubjectWorkplacePriorityStatusActions
No GI in this queue.
Read-only access
Risk Management module

Risk Management

Assessment, classification and monitoring of geotechnical risks by zone and workplace.

Active plans0
Critical priority0
Overdue0
Linked inspections0

Scaling Inspection

Scaling history

ReferenceWorkplaceMethodInspectorStatusDate
No Scaling inspection.

Rehabilitation plan

Rehabilitation Evolution

ReferenceWorkplaceWorkPriorityOwnerDue dateProgressStatusAction
No monitoring records.
1. LookupsProvides controlled codes, descriptions and coefficients
2. Hazard RatingCalculates hazard level and risk automatically
3. ChecklistLink controls and actions to the same inspection
Legacy Excavations

Hazard Ratings

KCC model
Adjustment Rating0
Hazard Rating0
Hazard LevelLow
Risk Rating0
Risk Priority4
Check ScalingAnnual Check Scaling
Hazard RatingLow - 0Standard controls and routine monitoring.
Field verification

Inspection Checklist

Incomplete
Generated actionsComplete the checklist to generate actions linked to this inspection.
Hazard Rating reference tables and coefficients

Hazard Rating register

ReferenceArea / StopWorkplaceExcavationGroundAdjustmentSupportHazardExposureRisk RatingRiskCheck ScalingInspectorDate
No Hazard Rating.
Read-only access
Geotech access only

Geotechnical Instruction

Total Instructions0
Pending Validation0
Approved0
Critical0

New Geotechnical Instruction

Instruction details

Review routing

List the responsible reviewers and their acknowledgement status. This register is not an electronic signature; controlled approvals must use the Approvals module.

#Acknowledgement ref.NameJob titleDepartmentDateStatusComment
1
2
3
4
5

GI Export Files

Geotechnical instruction archive

Instruction No.SubjectWorkplacePriorityStatusPrepared byDateActions
No GI saved.
Geotech access only

Ground Support Standard

SUPPORT COMPLIANCE SYSTEM

STANDARD

90 - 100

NCN

80 - 89

NCR - 1

70 - 79

NCR - 2

< 70

Role Standard NCN NCR-1 NCR-2
Geotech / Mine Supervisor✔✔✔✔
Geotech / Mine Superintendent✔✔✔✔
Coordinator / Senior / Manager✔✔✔
Mine General Manager✔✔
Geotech Manager + Operations Manager✔
Nil
Assess, review and remediate
Shutdown
Total Standards0
Active0
Critical Rules0
Versionv1.1

Standard Header

Add Support Rule

Official Ground Support Library

Based on the official Ground Support document integrated into GUIMS.

TYPE 1 6.0 m (w) x 6.0 m (h)

  • Primary support: 2.4 m split sets on walls and back.
  • Spacing: 1.5 m between bolts.
  • Wire mesh with 0.3 m minimum overlap.
  • Mesh must not exceed 4.5 m from face after blasting.
  • General control: extra bolts required when excavation exceeds standard dimensions.

TYPE 2 6.0 m (w) x 6.0 m (h)

  • Primary support: 2.4 m split sets.
  • Spacing between bolts: 1.5 m.
  • Mesh overlap: minimum 0.3 m.
  • Mesh must not exceed 4.5 m from face after blasting.
  • Secondary support: not required unless conditions change.

TYPE 3 6.0 m (w) x 6.0 m (h)

  • Type 2 support must be completed before Type 3 starts.
  • Secondary support: 6.0 m cable bolts along excavation.
  • Cable bolt spacing: 2.0 m.
  • Cable bolts must not exceed 1.0 m from excavation front.
  • TARP required during entry verification and safety declaration.

TYPE 4 12.5 m (w) x 6.0 m (h)

  • Type 3 support must be completed before slashing begins.
  • Secondary support: 6.0 m cable bolts along extended excavation.
  • Cable bolt spacing: 2.0 m.
  • Cable bolts must not exceed 1.0 m from excavation front.
  • Extra bolts required where excavation dimensions exceed standard.

Face Support

  • Primary support Type 1 or Type 2 must be completed before face support installation.
  • Install 2.4 m bolts on face.
  • First row of wall bolts should not exceed 1.0 m from roof.
  • Mesh must be wrapped around walls and face.
  • Mesh overlap should be 0.3 m to 0.5 m.

Intersections

  • Type I or Type II support must be completed before secondary support.
  • Install 6.0 m cable bolts fully grouted at intersections.
  • Cable bolt spacing: 2.0 m.
  • Distance between support and excavation must not exceed 1.0 m.
  • Check bolts, mesh, plates and surface shotcrete conditions.

Geological Discontinuities

  • Discontinuities must be clearly demarcated with spray paint.
  • Overhangs and wedges must be supported.
  • If overhang exceeds 1.0 m, install extra bolts on the overhanging face.
  • Angles below 70° are not accepted against excavated surface.
  • Apply TARP after entry verification and safe declaration.

Stope Brow Longhole stope

  • Overhangs, dykes and faults must be clearly demarcated.
  • Install first row of 6.0 m cable bolts at least 2.0 m from planned stope brow.
  • Cable bolts spacing: 2.0 m.
  • Distance between excavation wall and cable bolts must not exceed 1.0 m.
  • Extra bolts required when excavation dimensions exceed standard.

Support Compliance System

Standard

90 - 100

NCN

80 - 89

NCR - 1

70 - 79

NCR - 2

< 70

Role Standard NCN NCR - 1 NCR - 2
Geotech / Mine Supervisor ✔ ✔ ✔ ✔
Geotech / Mine Superintendent ✔ ✔ ✔ ✔
Coordinator / Senior / Manager ✔ ✔ ✔
Mine General Manager ✔ ✔
Geotech Manager + Operations Manager ✔
Nil
Assess, review and remediate
Shutdown

Compliance Auto Decision Engine

Official Ground Support document not included in this handoff package (proprietary).

Ground Support Standard Library

Version Activity Group Parameter Standard Min Max Unit Risk Photo Frequency Action Status
No standard rule saved.

Default Standards

Read-only access
Geotech access only

Pull Test Bolt pull-out testing

Total Tests0
Pass0
Fail0
Inconclusive0

Monthly Pull Test Portal

The month list is generated automatically and each month supports 100 numbered tests.

Pull Test Data

Equipment, calibration and witness details

Pull Test Archive

MonthTest N°ZoneAreaLocation and LevelPlaceActivityLithologyRMRBolt LengthBolt DiameterTarget LoadMax LoadResultOperatorWaterRemarksApprovalActions
No Pull Test saved.
Laboratory quality control

Laboratory

Analysis and monitoring of applied shotcrete strength in the mine.

0 tests
Supplier analysis

Shotcrete Altecrete

ALT
Calculated strength0.00 MPa
CompliancePending
Internal analysis

Shotcrete Kamoto

KMT
Calculated strength0.00 MPa
CompliancePending

Laboratory Records

Altecrete and Kamoto analyses are stored in a shared register.

RefAnalysisDateWorkplaceBatchAgeStrengthRequiredStatusAnalysed by
No laboratory record loaded.

Reports

Overview of geotechnical activities

Authoritative synchronized records · not yet generated
✓
INSPECTIONS0

Total inspections

○
COMPLIANT0

0%

△
NON-COMPLIANT0

Non-compliant inspections

▤
ACTIONS ISSUED0

Corrective actions

↥
PULL TESTS0

0%

000

INSPECTIONS BY ACTIVITY TYPE

0Total

INSPECTIONS BY LEVEL

RISK DISTRIBUTION

TOP NON-COMPLIANCES

#DefectCount%

PULL TESTS - DETAILED SUMMARY

0%Compliance

COMPLIANCE CLASSIFICATION

ClassRangeQuantity

LATEST INSPECTIONS

DateZoneLevelActivityRiskCompliance

CORRECTIVE ACTIONS

ActionZonePriorityStatus

GEOTECHNICAL MONITORING

Total instruments0
Active instruments0
New readings · 24h0
Active alerts0
Critical alerts0

MONITORING ACCESS

Open instrument-level trends, alert history, maintenance, calibration and detailed exports.

GENERATED DOCUMENTS

AUTOMATIC ALERTS

GENERAL COMMENTS

HIGH-RISK FINDINGS

LocationActivityRiskDescriptionStatus
IT administration

User Management

Manage account identity, access level, approval and status.

Restricted to IT Admin and Super Admin

Create / edit account

User accounts

0 accounts
EmailFull nameEmployee numberDepartmentRoleApprovalStatusActions
No users found.

Audit log

DateUserModuleActionResultDetails
No audit entries.
Application administration

Settings

Configure the interface, sign-in and editing rules.

Configuration loaded

General options

Main behavior and user identity.

Interface management

General appearance, density and navigation.

Interface previewChanges are visible immediately.

Font and readability

Adapt readability for office and field screens.

Sign-in and session

Account and session security options.

IT / Admin

Editing and control

Rules applied to technical records.

IT / Admin

Saving

Backups, versions and exports.

Language and formats

Choose the language of the interface for your account.

Accessibility

Improve ease of use.

Privacy and local data

Control preferences saved on this device.

User-
Preferences0
Local storage0 KB

Advanced options

Diagnostics and technical configuration.

IT / Admin